Stadskantoor, Utrecht

Utrecht

The building is designed by Kraaijvanger architects and will be completed in 2013/2014. The lower floors of the city hall are intended for public functions. Level six to eleven are rectangular and connect the two office towers. The structural stability is a display feature of the facade.

NeroQom Consultancy was asked by Scheldebouw for delivery, performance and aesthetic quality of the composite facade materials, as described in the construction specification drawn up by the architect, to evaluate objectively with respect to the feasibility of the future building maintenance.

building specifications, analysis